BGE Meter Releases

A permit is required for each meter release.  If an electrical service installation requires a "work/with" with BGE, the following steps should be observed:

  • Complete as much of the work that can be done prior to the "work/with."
  • A service inspection must be scheduled via your online portal account.
  • You must call the inspector prior to the inspection to explain the installation. Inspectors can be reached by calling 410-887-3960, Monday through Friday, between 7:30 and 8 a.m. or 3 and 3:30 p.m.

IMPORTANT NOTE REGARDING PERMIT ADDRESSES

Only one address is permitted on each permit and must reflect the actual address of the building. Make sure this address is aligned with the address BGE has provided. Frequently, the use of the acronym AKA is used in the address section of the permit application so that the address matches the location in the SDAT tax records, and BGE also has an address which matches their records.

MULTIPLE METERS AT ONE ADDRESS

Multiple meters on the same permit are permitted, provided they are all ready for inspection and release at the same time. When listing multiple meters on the same permit, information must be provided in the body of the permit such that BGE is able to determine the size of the service being applied to each tenant (for example: 100amps Units A through D; 150amps Units E, G, H; 200amps Units F and I, etc.)

ABOUT THE METER RELEASE PROCESS

A copy of your permit can be released only once to Baltimore Gas and Electric (BGE).

  1. Schedule BGE Meter Release

    Learn how to schedule a BGE meter release via your online account.

  2. Release Permit

    A copy of the permit is sent to BGE. The information provided within the permit is the only information BGE receives. If we are to provide a verbal or faxed meter release, it will take at least 24 hours to reflect in BGE's system.

  3. Contact BGE

    At the request of BGE, allow five business days after the electrical inspections were approved before calling the BGE call center.

  4. Schedule Meter Installation

    Instruct all customers to call their contractors to schedule their meter installation.

CONTACT BGE

For questions regarding a meter release, contact BGE(link is external).

Explore Electrical Inspections

  • Electrical Licensing
  • Schedule an Inspection
  • Alarm Installations
  • Solar Photovoltaic Systems Installation
  • Generator Installations
  • BGE Meter Releases
  • Electrical Administrative Board

Contact Us

Electrical Inspections

111 West Chesapeake Avenue
Room G-24
Towson, Maryland 21204

Hours

Monday through Friday
7:30 a.m. to 3:30 p.m.

Email

electinsp@baltimorecountymd.gov

Phone

410-887-3960

BALTCOGO311

Report a problem

Follow Us

Subscribe to the Daily Notice(link is external)

Image of the Baltimore County Seal
Baltimore County Government
400 Washington Avenue, Towson Maryland 21204(link is external)
BaltCoGo 311 Logo
Download now on:
  •   App Store (link is external)
  •   Google Play (link is external)

Find Information

  • Find a County Service
  • Phone Numbers
  • Report a Problem
  • Directions (link is external)

Policies

  • User Terms
  • Privacy
  • Reasonable Accommodation

Connect With Us

(link is external) (link is external) (link is external)

Translate

English العربية Français 한국어 Русский Español
© Copyright 2025 Baltimore County Government
Back to top