Skip to main content
Image of the Baltimore County Seal

Main navigation

  • Services
  • Report
  • Pay
  • Apply
  • Contact
Baltimore County Government
Use the dropdown menu to select your preferred language
English العربية Français 한국어 Русский Español

Breadcrumb

  1. Home
  2. Departments
  3. Environmental Protection and Sustainability
  4. Development Laws and Regulations

Development Laws and Regulations

Environmental Protection and Sustainability (EPS) implements and enforces a variety of Federal, State and local regulations to protect and enhance Baltimore County’s natural resources. Programs involved with these activities include:

AGRICULTURAL AND LAND PRESERVATION

The Land Preservation Regulations contain Baltimore County Code 32-4-415 (c)(link is external), which provides requirements for review of construction and subdivision on prime and productive soils on RC-2 zoned land.

ENVIRONMENTAL IMPACT REVIEW

Find information on the Environmental Impact Review:

  • Agricultural Minor Subdivision Regulations—Procedure for agricultural minor subdivisions.
  • Chesapeake Bay Critical Area—Laws and regulations affecting the Chesapeake Bay Critical Area can be found in the Baltimore County Code. View the following locations for regulations specific to the Chesapeake Bay Critical Area:
    • County Code, Article 33(link is external)—Baltimore County Chesapeake Bay Critical Area law
      • County Code, Article 33, Title 2—Chesapeake Bay Critical Areas Protection(link is external)
    • County Code, Article 32, Title 9—Growth Allocation(link is external)
    • County Zoning Regulations(link is external)—Several Miscellaneous Sections (contact Environmental Impact Review staff for details)
  • County Code, Article 32, Title 9(link is external)—Baltimore County Growth Allocation law
  • County Code Article 33, Title 6(link is external)—Forest Conservation
  • Forest Conservation Manual and Appendices—This is a technical manual developed by Baltimore County for implementation of the Forest Conservation regulations.
  • County Code Article 33, Title 3(link is external)—Protection of water quality, streams, wetlands and floodplains, and Forest Buffer law
  • Environmental Agreement Guidelines and Form—Review the procedures for development and redevelopment activities that require a security bond and an environmental agreement between the developer and Baltimore County. This page details the guidelines for the agreement and also includes the current Environmental Agreement form.

GROUND WATER MANAGEMENT

The Ground Water Management Section (GWM) is generally responsible for enforcing the Code of Maryland Regulations (COMAR) 26.04(link is external). Specific County laws, regulations and policies related to these responsibilities include Section 1.03 of the Code of Baltimore County Regulations (COBAR) as well as the GWM policy manual.

INSPECTION AND ENFORCEMENT

The Inspection and Enforcement Section moved to the Department of Permits, Approvals and Inspections in February 2012.

The Grading Regulations contains Section 1.04 of the Code of the Baltimore County Regulations (COBAR) which was adopted on April 22, 2005, and pertains to excavating, grading, sediment control and forest management in Baltimore County.

STORMWATER ENGINEERING

The Stormwater Management Regulations contain Article 33, Title 4 of the Baltimore County Code(link is external) that was adopted in response to Stormwater Management (SWM) Act of 2007. The intent of the Act it to  improve the effects of storm water runoff, and thereby improve the quality of the Chesapeake Bay. Article 33, Title 4 significantly affects the design of storm water components for land development projects. Some of the more significant changes are:

  • Environmental Site Design to the Maximum Extent Practicable must be addressed for all projects, including redevelopment.
  • Three sequential plan submissions and reviews are now required: Concept SWM Plan; Development SWM Plan; and Final SWM Plan.
  • Redevelopment projects will require 50 percent reduction in impervious surface or equivalent water quality management.
  • No grading or building permits may be issued until sediment control and SWM plans are signed.

To review the COMAR revisions and become familiar with all the changes to the Design Manual, visit the Maryland Department of the Environment(link is external).

Review and download stormwater engineering checklists for submission to Stormwater Engineering.

Contact Us

Environmental Protection and Sustainability

County Office Building
111 West Chesapeake Avenue
Room 305
Towson, Maryland 21204

Email

eps@baltimorecountymd.gov

Phone

410-887-3733

Director

Horacio Tablada

Follow Us

Follow @CleanGreenBaltCo(link is external)

Follow @BaltimoreCounty EPS(link is external)

Image of the Baltimore County Seal
Baltimore County Government
400 Washington Avenue, Towson Maryland 21204(link is external)
BaltCoGo 311 Logo
Download now on:
  •   App Store (link is external)
  •   Google Play (link is external)

Find Information

  • Find a County Service
  • Phone Numbers
  • Report a Problem
  • Directions (link is external)

Policies

  • User Terms
  • Privacy
  • Reasonable Accommodation

Connect With Us

(link is external) (link is external) (link is external)

Translate

English العربية Français 한국어 Русский Español
© Copyright 2025 Baltimore County Government
Back to top