  1. EPS Variances
  2. Planning Board Meetings—Canceled
  3. Liberty Road Study Community Meetings
  4. Comprehensive Zoning Map Process 2020 Has Begun
  5. Four Miles of New Water Line for Parkville
  6. Water Project on Back River Neck Road
  7. Harewood Park Sewer Pumping Station
  8. Campbell Boulevard
  9. The Future Fullerton Reservoirs
  10. Mohrs Lane Bridge
  11. Administrative Variances
  12. Development Meetings
  13. Zoning Hearings

EPS Variances

The Department of Environmental Protection and Sustainability (EPS) publishes a list of the environmental administrative variance requests along with their status. The requests are listed by County Council District.

Information: EPS Variances for District 6

Planning Board Meetings

Baltimore County Planning Board meetings are scheduled as follows:

  • None scheduled for November.

Information: Contact Myles Muehlberger by phone at 410-887-3482 or by email at mmuehlberger@baltimorecountymd.gov.

Liberty Road Study Community Meetings

The County is conducting a study of Liberty Road and we want to hear from you! A successful study depends upon an inclusive planning process that receives input from a diverse range of voices in the community. The County will be holding a set of community engagement meetings in November at two locations within the study area. The intent is to rotate venues throughout to engage feedback from a diverse set of stakeholders.

Community meetings are scheduled as follows:

  • Thursday, November 21, from 6 to 8:30 p.m., in the Randallstown Liberty Center, 3637 Offutt Road, Randallstown, Maryland 21133

The meeting will begin with a short presentation about the plan process followed by an opportunity to provide open-ended feedback about issues and opportunities in the communities surrounding the Liberty Road corridor.

Information: Contact Ngone Diop by phone at 410-887-3480 or by email at libertyroad@baltimorecountymd.gov.

Comprehensive Zoning Map Process 2020 Has Begun

The Comprehensive Zoning Map Process (CZMP) takes place every four years on an exact schedule specified in the County Code. Any citizen may request a zoning change on any property in Baltimore County, although the usual participants in the process are individual landowners, contract purchasers, community organizations, County staff, the Planning Board and the County Council.

The CZMP covers a period of approximately 12 months and results in zoning decisions that are reflected in a final log of issues. Ultimately, the County Council decides on each issue whether to retain the existing zoning or to enact a different zone(s) or district(s). Generally, each issue is a single property, but an issue might cover many adjoining properties and might even cover many hundreds of acres. The zoning on all properties that were not issues is reenacted without change.

View a list of public hearing dates and locations. For more information, please visit the CZMP page.

If you have any questions, please contact the Department of Planning, 105 West Chesapeake Avenue, Suite 101, Towson, Maryland 21204. Call 410-887-3480 or email czmp2020@baltimorecountymd.gov.

Four Miles of New Water Line for Parkville

Baltimore County will install more than four miles of new water mains in the Harford Park community in Parkville beginning this year. The new ductile iron pipes will be located in an area bounded by Perring Parkway, Taylor Avenue, Harford Road and the Baltimore City line. The $5.6 million project includes the reinstallation and relocation of 705 water service connections to water customers.

Information: Contact the Bureau of Engineering and Construction at engineering@baltimorecountymd.gov.

Water Project on Back River Neck Road

Baltimore County is replacing 9,832 feet of cast-iron water pipe on Back River Neck Road from Hyde Park Road to Mizells Road. Work began in October. The old pipe, prone to frequent breaks and dating from the 1930s, will be replaced with ductile iron pipe. The project, costing about $4.15 million, is expected to be completed by the fall of 2020.

Information: Contact the Bureau of Engineering and Construction at engineering@baltimorecountymd.gov.

Harewood Park Sewer Pumping Station

Baltimore County has begun renovating the Harewood Park Sewer Pumping Station at 12901 Princeton Road in Chase. Work on the $3.3 million project officially began in July 2018—it's now 66 percent complete—and will take about a year to finish.

Information: Contact the Bureau of Engineering and Construction at engineering@baltimorecountymd.gov.

Campbell Boulevard

Baltimore County is extending Campbell Boulevard from Bird River Road to Windlass Run. Construction of the $5 million project began in October 2018 and is expected to take about a year and a half to complete.

Information: Contact the Bureau of Engineering and Construction at engineering@baltimorecountymd.gov.

The Future Fullerton Reservoirs

In February 2017, the Department of Public Works and Transportation and Transportation broke ground on the Fullerton Reservoirs. Three have been planned for the site. Construction is expected to take about three years and cost $80.1 million. Engineers estimate the project is about 90 percent complete. The construction site is bounded by Ridge Road, Bucks School House Road and Perry Hall Boulevard.

Information: Call the Bureau of Engineering and Construction, Water Design, at 410-887-3783 or email engineering@baltimorecountymd.gov.

Mohrs Lane Bridge

The Mohrs Lane Bridge (Bridge B-0143) over the CSX Railroad, north of Pulaski Highway, was closed in 2007 because of structural deterioration. Demolition was completed by CSX in 2011 at no cost to Baltimore County, which assumed ownership and plans to rebuild the span. A new bridge is currently being designed with construction scheduled to begin by late 2020. This bridge will be part of the future Campbell Boulevard Corridor.

Information: Contact the Bureau of Engineering and Construction at engineering@baltimorecountymd.gov.

Administrative Variances

Administrative Variances pending include requests for Administrative Variances pending before the Department of Permits, Approvals and Inspections. These hearings up-to-date as of the publication of this newsletter and are subject to change.

Information: Call the Office of Administrative Law Judges at 410-887-3868 or call Zoning Review at 410-887-3391.

There are no Administrative Variances pending at the time of publication of this newsletter. Please visit the Zoning calendar for changes in District 6.

Development Meetings

Development Meetings include Community Input, Concept Plan, County Review, Development Review Committee and Hearing Officers Hearings. These hearings are up-to-date as of the publication of this newsletter and subject to change.

Information: Call 410-887-3321.

Development Review Committee—United House of Prayer (Old Business)
Date and Time: Tuesday, November 26, 2 to 2:30 p.m.
Property Location: 6314 Kenwood Avenue
Meeting Location: County Office Building, Room 123, 111 West Chesapeake Avenue, Towson, Maryland 21204
DRC Number: 040219A
Tracking Number: DRC-2019-00031
Request: The request is to combine three parcels into one lot and construct a new church building of approximately 10,303 square feet.
Information: Contact Lloyd Moxley at lmoxley@baltimorecountymd.gov or 410-887-3321.

Zoning Hearings

Zoning Hearings include Special Exceptions, Variances and other issues before the Office of Administrative Hearings of Baltimore County. These hearings are up-to-date as of the publication of this newsletter and are subject to change.

Information: Call the Office of Administrative Law Judges at 410-887-3868 or call Zoning Review at 410-887-3391.

Zoning Hearings—5401 Campbell Boulevard
Date and Time: Monday, November 18, 10 to 11 a.m.
Case Number: 2019-0453-SPH
Property Location: Southeast side of Philadelphia Road, 385 feet south of the centerline of Campbell Boulevard
Legal Owners: Whitemarsh Associates, LLC
Special Hearing to permit the development of a site located waiver in a riverine floodplain to allow grading, paving, landscaping and other site work and construction of building, parking and road within the floodplain, and to allow a zero-foot freeboard line building setback (Department of Public Works and Transportation and Transportation Plate D-P).
Hearing Location: Jefferson Building, 105 West Chesapeake Avenue, Room 205, Towson, Maryland 21204
Information: Contact the Zoning Office at 410-887-3391.

Zoning Hearings—9 Schooner Bay Court
Date and Time: Monday, November 18, 1:30 to 2:30 p.m.
Case Number: 2019-0404-A
Property Location: East side of Schooner Bay Court, south of Seneca Garden Road
Legal Owners: Jeff and Heather Lyon
Variance to permit an open projection deck with a side yard setback of zero feet and a rear yard setback of two feet in lieu of the required 11.25-foot setbacks, respectively.
Hearing Location: Jefferson Building, 105 West Chesapeake Avenue, Room 205, Towson, Maryland 21204
Information: Contact the Zoning Office at 410-887-3391.

Zoning Hearings—703 Fuselage Avenue
Date and Time: Thursday, November 21, 10 to 11 a.m.
Case Number: 2019-0465-A
Property Location: Northeast side of Fuselage Avenue, southeast of Right Elevator Drive
Legal Owners: Michael and Marla Jones
Variance to permit an addition with a front yard setback of 12 feet in lieu of the front yard average of 16 feet.
Hearing Location: Jefferson Building, 105 West Chesapeake Avenue, Room 205, Towson, Maryland 21204
Information: Contact the Zoning Office at 410-887-3391.

Zoning Hearings—7049 Greenbank Road
Date and Time: Monday, November 25, 10 to 11 a.m.
Case Number: 2019-0480-A
Property Location: Southeast side of Greenbank Road, northwest of Miles Road
Legal Owners: Donald and Karen Lombardi
Variance: Section 427.1 of the Baltimore County Zoning Regulations and Building Code 122.1: To permit a six-foot high residential fence that adjoins the neighboring front yard in lieu of the required 10-foot setback of the adjoining property line, and permit a six-foot residential fence located in the front yard in lieu of the maximum height of 42 inches.
Hearing Location: Jefferson Building, 105 West Chesapeake Avenue, Room 205, Towson, Maryland 21204
Information: Contact the Zoning Office at 410-887-3391.