Skip Navigation

Francis Scott Key Bridge Incident Updates
Watch the Recording of County Executive John A. Olszewski Jr. delivering the Proposed FY25 Budget Message

November 15, 2018 – Council District 5

  1. EPS Variances
  2. Planning Board Meetings
  3. Baynesville and Pine Grove Water Project
  4. Stoneleigh-Anneslie Stormwater Project
  5. Water Line Replacement in Campus Hills
  6. Water Line Rehabilitation: The Towson Fourth System
  7. Sewers: Jones Falls Structural Rehabilitation Phase 1
  8. Sewers: Herring Run Structural Rehabilitation Phase 1
  9. Extension of Missing Curb, Sidewalk-Widening on Cross Road
  10. The Future Fullerton Reservoirs
  11. Administrative Variances
  12. Development Meetings
  13. Zoning Hearings

EPS Variances

The Department of Environmental Protection and Sustainability (EPS) publishes a list of the environmental administrative variance requests along with their status. The requests are listed by County Council District.

Information: EPS Variances for District 5

Planning Board Meetings

Baltimore County Planning Board meetings are scheduled as follows:

  • Thursday, November 15, at 4 p.m., in Room 104, Jefferson Building, 105 West Chesapeake Avenue in Towson

Information: Call the Department of Planning at 410-887-3211.

Baynesville and Pine Grove Water Project

Baltimore County is investing $2.2 million to clean and structurally reline 11,111 feet of water line in the Baynesville-Pine Grove area east of Towson. The work to improve the old, cast-iron pipe began in April and should be finished by November. It is now 95 percent complete. 

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

Stoneleigh-Anneslie Stormwater Project

Baltimore County is addressing storm runoff concerns in the Stoneleigh-Anneslie community east of York Road. County engineers are designing a solution to update the 100-year-old drainage system which is currently serving the community. Baltimore County has earmarked $1 million for the project. During the process, County engineers and residents have been meeting to discuss and clarify community issues.

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

Water Line Replacement in Campus Hills

Baltimore County is replacing an existing eight-inch diameter cast-iron pipe in the Campus Hills area. Construction began in June and is about 25 percent complete. The project will cost $2.5 million.

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

Water Line Rehabilitation: The Towson Fourth System

The Department of Public Works and Transportation and Transportation is replacing water lines in:

  1. Joppa Road, between Old Harford Road and Drumwood Road
  2. Oakleigh Road between Joppa Road and White Oak Road
  3. Satyr Hill Road from Lowell Ridge Road to Harford Road

The project began in February. It will be completed by spring 2019 and will cost $6.7 million. It is now 75 percent complete.

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

Sewers: Jones Falls Structural Rehabilitation Phase 1

Baltimore County began rehabilitating 66,000 feet of sewer line in July 2017 throughout Council Districts 2 and 5. The project will last a year and a half and will cost $3,393,583.60. It is now 71 percent complete.

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

Sewers: Herring Run Structural Rehabilitation Phase 1

Baltimore County is rehabilitating 81,000 feet of sewer line spread throughout Council Districts 5 and 6. Work has progressed rapidly and is about 87 percent toward completion. It is expected to be completed in a year and a half and cost $4,640,123.

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

Extension of Missing Curb, Sidewalk-Widening on Cross Road

The Department of Public Works is planning to fill in missing curbs and sidewalks on Cross Road between Chapel Road and Honeygo Boulevard. Construction is expected to be done this year.

Information: Email the Department of Public Works at engineering@baltimorecountymd.gov.

The Future Fullerton Reservoirs

The County’s contractor received a “notice to proceed” in January 2017 and the Department of Public Works and Transportation and Transportation broke ground on February 7, 2017 on the Fullerton Reservoirs—three are planned for the site. Construction is expected to take about three years and cost $80.1 million. The construction site is bounded by Ridge Road, Bucks School House Road and Perry Hall Boulevard. Engineers estimate that the project is now 74 percent complete.

Information: Call the Bureau of Engineering, Water Design at 410-887-3783 or email engineering@baltimorecountymd.gov.

Administrative Variances

Administrative Variances Pending include requests for Administrative Variances pending before the Department of Permits, Approvals, and Inspections. These hearings are up-to-date as of the publication of this newsletter and are subject to change.

Information: Call the Office of Administrative Law Judges at 410-887-3868 or Zoning Review at 410-887-3391.

There are no Administrative Variances pending at the time of publication of this newsletter. Please visit the Zoning Calendar for changes in District 5.

Development Meetings

Development Meetings include Community Input, Concept Plan, County Review, Development Review Committee and Hearing Officers Hearings. These hearings are up-to-date as of the publication of this newsletter and subject to change.

Information: Call 410-887-3321.

There are no Development Meetings scheduled at the time of publication of this newsletter. Please visit the Development Management Calendar for changes in District 5.

Zoning Hearings

Zoning Hearings include Special Exceptions, Variances and other issues before the Office of Administrative Hearings of Baltimore County. These hearings are up-to-date as of the publication of this newsletter and are subject to change.

Information: Call 410-887-3391.

Zoning Hearings—7923, 7925, 7927 Belair Road
Date and Time: Thursday, November 29, 1:30 p.m. to 3:30 p.m.
Case Number: 2019-0062-A
Property Location: East side of Belair Road at the corner of the south side of Rossville Boulevard
Legal Owners: FP SUB LLC c/o Kimco Realty Corporation
Variance:

  1. To permit a freestanding identification sign with a maximum size of 228 square feet in lieu of the permitted 150 square feet (Sign 1).
  2. To permit a joint identification sign with a maximum sign copy of six inches in height in lieu of the required eight inches in height for sign copy (Sign 1).
  3. To permit a joint identification sign with a minimum sign copy of 2.5 inches in height in lieu of the required eight inches in height for sign copy (Sign 2).
  4. To allow wall-mounted enterprise signs on building facades without separate, exterior customer entrances (Signs 3 and 4).
  5. To allow wall-mounted enterprise signs to be installed in a different location than the tenant space (Signs 3 and 4).
  6. To permit two additional electronic changeable copy, freestanding joint identification signs accessory to a planned shopping center for a total of four on a single premises in lieu of the permitted one sign (Signs 1 and 2).

Hearing Location: Jefferson Building, 105 West Chesapeake Avenue, Room 205, Towson, Maryland 21204