Other Metro District Charges

Water And Sewer Property Connection Charges

This charge is to defray the cost of the actual connection from the water or sewer main to the property line. Properties that have frontage on existing mains should call Permits, Approvals and Inspection at 410-887-3900 to get information on procedures.

Petition Project - This charge may be financed for 40 years at five percent interest; however, financing is limited to residential properties with existing owner occupied dwellings.

Health Project - With County Council approval, Health projects may be financed for 40 years at five percent interest; however, financing is limited to residential properties with existing dwellings.

Back to top

Water And Sewer Systems Connection Charges*

Sewer Systems Connection Charge - $875
Water Systems Connection Charge - $575

*The connection charge is based on a 5/8 inch water meter. A larger meter will result in a higher charge.

This charge helps to defray the cost of the master facilities necessary to serve the property owners. These master facilities include filtration and treatment plants, large transmission lines, pumping stations, water towers, etc. The master facilities enables the water and sewer systems to operate. The charges collected do not by themselves pay for the facilities. The balance of the cost is acquired through bonds issued by the Metropolitan District of Baltimore County. Revenues collected through these charges enables Baltimore County to keep the amount of debt financing (bond issues) to a minimum.

Petition Project - This charge may be financed for 40 years at five percent interest; however, financing is limited to residential properties with existing owner occupied dwellings.

Health Project - This charge may be financed for 40 years at five percent interest; however, financing is limited to residential properties with existing dwellings.

The charges above may be paid off at any time, decreasing the annual charges on the property tax bill.

Back to top

Water And Sewer Deficit Charges

This is the property owner's share of the difference between the actual cost of constructing the water or sewer mains and the revenue derived from the benefit assessments. These charges are based on the same average width footage used to calculate the benefit assessment; however, there is no standard rate per foot. The cost per foot is determined by actual contract costs and therefore will vary by contract. These charges are normally amortized over 40 years at five percent interest.