Catonsville - District 1 c 1 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: A-2 with pre-qualified E, F-2 and F-3 subcontractors Bid Date: Postponed until further notice *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: 1,150 (TON) 4" HMA Superpave 12.5 mm, PG 64-22, Level 2 775 (TON) 2" HMA Superpave 9.5 mm, PG 64-22, Level 2 725 (CY) 8" Base Course using Graded Aggregate - 2 to 4" Courses 10,750 (SY) Milling existing Asphalt Pavement - 2" Depth 1,240 (LF) 15" Reinforced Concrete Pipe Class 4 21,250 (SF) 4" Concrete Sidewalk 855 (SY) 7" Portland Cement Concrete Pavement for Driveways and Alleys, Mix 6 on 4" Graded Aggregate Base 2,885 (LF) 7" Concrete Combination Curb and Gutter, Mix 6 on 3" Graded Aggregate Base 50 (EA) Reset existing Water Meters 1 (EA) 12" x 6" Tapping Sleeve, Valve and Vault A pre-bid meeting will be held on Wednesday, September 30, 2009 at 10 a.m. local time in room 215, County Office Building, 111 West Chesapeake Avenue, Towson, MD 21204. MBE required Addendums - six Cost: $15 (pick-up)/$20 (includes US Mail postage and handling fees) Available on or after: Tuesday, September 8, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Gray and Son Inc | Not Applicable | | Concrete General Inc | Not Applicable | | Potts and Callahan Inc | Not Applicable | | Machado Construction Company Inc | Not Applicable | | P Flanigan and Sons Inc | Not Applicable | | General Paving and Contracting Inc | Not Applicable | | Melvin Benhoff Sons Inc | Not Applicable | | Meekins Construction Inc | Not Applicable | | Charles J Miller LLC | Not Applicable | | Dixie Construction Company Inc | Not Applicable | | Ross Contracting Inc | Not Applicable | | Bosley Construction Inc | Not Applicable | | Peak Inc | Not Applicable | | Olney Masonry Corporation | Not Applicable | | Kinsley Construction Inc | Not Applicable |
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Angelozzi Brothers Inc | $112,909.80 third | | Burgemeister Bell Inc | $106,267.51 low | | The Matricciani Company | $125,876.00 | | Cossentino Contracting Company Inc | $107,836.00 second | | Iacoboni Site Specialists Inc | No Bid | | Engineer's Estimate | $142,800.00 |
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Johnston Construction Company | $826,595.00 low | | Whiting Turner Contracting Company | $987,900.00 third | | Lee Foundation Company Inc | $1,059,808.00 | | Conewago Enterprises Inc | $989,000.00 | | Kinsley Construction Inc | $856,400.00 second | | J F Fischer Inc | No Bid | | J J I D Inc | $1,007,800.00 | | EMH Environmental Inc | $993,950.00 | | Engineer's Estimate | $1,338,153.00 |
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Norair Engineering Corporation | No Bid | | Cianbro Corporation | $7,121,065.00 | | Galway Bay Corporation | No Bid | | Conewago Enterprises Inc | $6,050,000.00 second | | Johnston Construction Company | $7,472,901.00 | | American Infrastructure | No Bid | | C O Falter Construction Corporation | No Bid | | EMH Environmental Inc | No Bid | | DSI Inc | No Bid | | M A Bongiovanni Inc | No Bid | | American Contracting and Environmental Services Inc | $6,595.000.00 third | | Whiting Turner Contracting Company | $5,796,900.00 low | | Engineer's Estimate | $9,945,900.00 |
Catonsville - District 1 c 1 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: G-2 with pre-qualified G-3 subcontractor Bid Date: Thursday, November 12, 2009 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: Upgrade existing station to increase reliability. A pre-bid meeting will be held at the station on Tuesday, September 22, 2009 at 9:00 a.m. local time. A second site visit will be held at the station on Tuesday, October 6, 2009 at 9 a.m. local time. A third site visit will be held at the station on Wednesday, November 4, 2009 at 9 a.m. local time. This will be the last chance to visit the station. No questions will be answered at the third and last site visit. MBE required Addendums: four Cost: $35 (pick-up)/$45 (includes US Mail postage and handling fees) Available on or after: September 14, 2009 | Pre-qualified Contractors who have purchase the bid package | Bid Amount | | Cianbro Corporation | Not Applicable | | American Contracting and Environmental Services Inc | Not Applicable | | Lee Foundation Company Inc | Not Applicable | | Whiting Turner Contracting Company | Not Applicable | | Conewago Enterprises Inc | Not Applicable | | EMH Environmental Inc | Not Applicable | | JJID Inc | Not Applicable | | Corman Construction Inc | Not Applicable | | Herr Brothers Inc | Not Applicable |
Contract #09070 WX0York Road - 24 Inch Water Main Replacement from Ridgely Road to Padonia RoadLutherville - District 8 c 3 Contract Cost Group "F" ($5,000,000 to $10,000,000) Work Classification: F-2 Bid Date: Thursday, December 17, 2009 at 10:45 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: 9,621 LF of 24" DIP and Fittings including Cathodic Protection 282 LF of 12" DIP and Fittings 935 LF of 8" DIP and Fittings 330 LF of 6" DIP and Fittings 6,100 Tons of Hot Mix Asphalt for SHA Road Repair using 19 mm, pg 64-22 for base course 2,400 Tons of 2" Hot Mix Asphalt Super Pave 12.55 mm, pg 64-22 for surface course 2,500 Tons of Stage 1 Temp. Hot Mix Asphalt in SHA Road A pre-bid meeting will be held on TUESDAY, NOVEMBER 17, 2009 at 10 a.m. local time in room 215, County Office Building, 111 West Chesapeake Avenue, Towson, MD 21204. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $15 (pick-up)/$20 (includes US Mail postage and handling fees) Available on or after: November 9, 2009 Bidder's List| Pre-qualified Contractor who has purchased the bid package | Bid Amount | | No Bidders Yet | Not Applicable |
Contract #09076 SX0Veronica Avenue Pumping Station Replacement - Waterview, 2402 Jarsey Avenue, 21219Edgemere - District 15 c 7 Contract Cost Group "C" ($500,000 to $1,000,000) Work Classification: G-2 with pre-qualified G-3 subcontractor Bid Date: Thursday, January 14, 2010 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: Upgrade station to increase reliability. A pre-bid meeting will be held at the station on Wednesday, November 18, 2009 at 9:00 a.m. local time. A second site visit will be held at the station on Wednesday, December 2, 2009 at 9 a.m. local time. A third site visit will be held at the station on Wednesday, January 6, 2010 at 9 a.m. local time. This will be the last chance to visit the station. No questions will be answered at the third and last site visit. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $25 (pick-up)/$30 (includes US Mail postage and handling fees) Available on or after: November 9, 2009 Bidder's List| Pre-qualified contractors who have purchased the bid package | Bid Amount | | No Bidders Yet | Not Applicable |
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Am Liner East | $1,021,552.00 | Miller Pipeline Corporation | $811,655.20 low | | Insituform Technologies | $837,495.50 second | | Reynolds Inliner LLC | $859,976.00 third | | Heitkamp Inc | No Bid | | Engineer's Estimate | $1,118,480.00 |
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Conewago Enterprises Inc | No Bid | | Corman Construction Inc | $675,000.00 second | | Kinsley Construction Inc | $513,911.00 low | | Peak Inc | No Bid | | Engineer's Estimate | $574,441.00 |
Edgemere - District 15 c 7 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: G-2 with pre-qualified G-3 subcontractor Bid Date: Thursday, December 17, 2009 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: Upgrade and improve station to increase reliability. A pre-bid meeting will be held at the station on Thursday November 5, 2009 at 9:00 a.m. local time. A second site visit will be held at the station on Thursday, November 19, 2009 at 9 a.m. local time. A third site visit will be held at the station on Tuesday, December 8, 2009 at 9 a.m. local time. This will be the last chance to visit the station. No questions will be answered at the third and last site visit. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $25 (pick-up)/$35 (includes US Mail postage and handling) Available on or after: October 26, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Cianbro Corporation | Not Applicable | | Lee Foundation Company Inc | Not Applicable | | Conewago Enterprises Inc | Not Applicable | | Corman Construction Inc | Not Applicable | | The Whiting Turner Contracting Company | Not Applicable | | JJID Inc | Not Applicable | | EMH Environmental Inc | Not Applicable |
Awarded to Low Bidder on October 30, 2009Bidders List| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Coastal Design and Construction Inc | $3,795,342.50 low | | Edwin A and John O Crandell Inc | $5,687,850.10 | | Baltimore Pile Driving and Marine Construction Inc | $4,878,857.30 third | | Langenfelder Marine Inc | $5,194,332.00 | | Corman Marine Construction Inc | $4,255,519.00 second | | A J Marine Construction Inc | No Bid | | Environmental Quality Resources LLC | $5,464,842.04 | | Engineer's Estimate | $3,702,900.50 |
Catonsville and Arbutus - District 1 c 1 Contract Cost Group "B" ($100,000 to $500,000) Work Classification: D-1 with pre-qualified K-5 subcontractor Bid Date: Tuesday, August 18, 2009 at 10:30 a.m. local time The proposed work consists of: Removal of roadway wearing surface and place new wearing surface along with completion of approached roadway. Maintenance of stream flow will be used. MBE required Addendums: 0 Cost: $35 (pick-up)/$40 (includes US Mail postage and handling fees) Available on or after: July 27, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Kinsley Construction Inc | Not Applicable | | Tessa Structures LLC | Not Applicable | | Whiting Turner Contracting Company | Not Applicable | | The Six M Company Inc | Not Applicable | | Allied Contractors Inc | Not Applicable |
Pikesville - District 3 c 2 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: G-2 with pre-qualified G-3 subcontractor Bid Date: Thursday, December 10, 2009 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: Replacing existing pumping station to increase reliability. A pre-bid meeting will be held at the station on Thursday, October 29, 2009 at 9:00 a.m. local time. A second site visit will be held at the station on Tuesday, November 10, 2009 at 9 a.m. local time. A third site visit will be held at the station on Tuesday, December 1, 2009 at 9 a.m. local time. This will be the last chance to visit the station. No questions will be answered at the third and last site visit. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required-see above Addendums: 0 Cost: $25 (pick-up)/$35 (includes US Mail postage and handling fees) Available on or after: October 19, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Conewago Enterprises Inc | Not Applicable | | Lee Foundation Company Inc | Not Applicable | | Corman Construction Inc | Not Applicable | | EMH Environmental Inc | Not Applicable | | JJID Inc | Not Applicable | | Cianbro Corporation | Not Applicable | | The Whiting Turner Contracting Company | Not Applicable | | Johnston Construction Company | Not Applicable |
Cockeysville - District 8 c 3 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: G-2 with pre-qualified G-3 subcontractor Bid Date: Thursday, December 3, 2009 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: Furnish all labor, materials and equipment required for the construction of existing pumping station improvements complete in place and ready to operate. A pre-bid meeting will be held at the station on Thursday, October 15, 2009 at 9:00 a.m. local time. A second site visit will be held at the station on Tuesday, October 27, 2009 at 9 a.m. local time. A third site visit will be held at the station on Tuesday, November 24, 2009 at 9 a.m. local time. This will be the last chance to visit the station. No questions will be answered at the third and last site visit. MBE required Addendums: 1 Cost: $50 (pick-up)/$55 (includes US Mail postage and handling fees) Available on or after: October 5, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Lee Foundation Company Inc | Not Applicable | | American Infrastructure | Not Applicable | | JJID Inc | Not Applicable | | Conewago Enterprises Inc | Not Applicable | | EMH Environmental Inc | Not Applicable | | The Whiting Turner Contracting Company | Not Applicable | | Cianbro Corporation | Not Applicable |
Dundalk - District 12 c 7 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: G-2 with pre-qualified G-3 subcontractor Bid Date: Tuesday, December 15, 2009 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: Upgrading existing station to increase reliability. A pre-bid meeting will be held at the station on Tuesday, November 17, 2009 at 9:00 a.m. local time. A second site visit will be held at the station on Wednesday, November 25, 2009 at 9 a.m. local time. A third site visit will be held at the station on Wednesday, December 9, 2009 at 9 a.m. local time. This will be the last chance to visit the station. No questions will be answered at the third and last site visit. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $30 (pick-up)/$40 (includes US Mail postage and handling fees) Available on or after: November 2, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid List | Cianbro Corporation
| Not Applicable | | Lee Foundation Company Inc | Not Applicable | | E M H Environmental Inc | Not Applicable | | Johnston Construction Company | Not Applicable | | Conewago Enterprises Inc | Not Applicable |
Awarded to the Low Bidder on November 2, 2009
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Cianbro Corporation | No Bid
| | American Infrastructure | $5,755,000.00
| | Joseph B Fay | $5,989,082.90
| | Corman Construction Inc | $5,345,208.75 low
| | Concrete General Inc | $5,966,404.20
| | Flippo Construction Company Inc | $5,745,622.00
| | Facchina Construction Company Inc | $6,684,910.00
| | McLean Contracting Company | $7,025,517.00
| | The Six M Company Inc | $5,996,531.43
| | Kibler Construction Company Inc | $5,508,147.80 third
| | The Whiting Turner Contracting Company | $5,828,564.00
| | Kinsley Construction Inc | $5,365,701.86 second
| | Tessa Structures LLC | No Bid | | Allied Contrators Inc | $7,856,404.00
| | JJID Inc | $6,906,475.60
| | Huntington and Hopkins Inc | No Bid | | Engineer's Estimate | $8,897,890.00 |
Owings Mills - District 2 c 4 Contract Cost Group "G" ($10,000,000 to $15,000,000) Work Classification: A-2 and D-4 with pre-qualified D-1 and F-2 subcontractor Bid Date: Tuesday, December 1, 2009 at 10:30 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: This project consists of extending Owings Mills Boulevard from Lyons Mill Road to Winands Road. The project consists of the construction of new closed section road (which was sidewalk and bike path), roadway widening, storm drain system reatining wall, a new single bridge over Horsehead Branch and 1 12 inch new water main. A pre-bid meeting will be held on Wednesday, November 18, 2009 at 10 a.m. local time in room 215, County Office Building, 111 West Chesapeake Avenue, Towson, MD 21204. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $25 (pick-up)/$30 (includes US Mail postage and handling fees) Available on or after: November 2, 2009 | Pre-qualified Contractors who have purchase the bid package | Bid Amount | Corman Construction Inc
| Not Applicable | | American Infrastructure | Not Applicable | | G A and F C Wagman Inc | Not Applicable | | Kibler Construction Company Inc | Not Applicable | | Kinsley Construction Inc | Not Applicable | | Melvin Benhoff Sons Inc | Not Applicable | | Concrete General Inc | Not Applicable | | Gray and Son Inc | Not Applicable |
| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | J Fletcher Creamer and Son Inc | $1,973,482.25 second | | Mainlining Service Inc | $2,010,415.00 third | | Spiniello Companies | $2,711,885.00 | | Heitkamp Inc | $1,912,191.00 low | | Metra Industries | $2,562,030.00 | | Engineer's Estimate | $2,495,710.00 |
Owings Mille - District 3 c 2 Contract Cost Group "B" ($100,000 to $500,000) Work Classification: B Bid Date: Tuesday, October 6, 2009 at 10:30 a.m. local time The proposed work consists of: Constructing drainage swale along west side of Garrison Forest Road to re-route runoff outside travel lane; reducing slippage and incidence of accidents in that road section. Utility relocation will be involved on this project. MBE required Addendums: one (mailed certified on 9/23/09) Cost: $15 (pick-up)/$20 (includes US Mail postage and handling fees) Available on or after: Tuesday, September 8, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Iacoboni Site Specialists Inc | Not Applicable | | Gray and Son Inc | Not Applicable | | Potts and Callahan Inc | Not Applicable | | Machado Construction Inc | Not Applicable | | General Paving and Contracting Inc | Not Applicable | | Melvin Benhoff Sons Inc | Not Applicable | | Greene Construction Company Inc | Not Applicable | | Dixie Construction Company Inc | Not Applicable | | Environmental Quality Resources LLC | Not Applicable | | Peak Inc | Not Applicable | | Pickens and Sons Inc | Not Applicable | | Allied Contractors Inc | Not Applicable | | Charles J Miller Inc | Not Applicable |
Parkville - District 9 c 5 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: F-6 Bid Date: Thursday, November 12, 2009 at 10:45 a.m. local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: 791 LF of Pipe Lining - 6" Sewer Main 19,415 LF of Pipe Lining - 8" Sewer Main 2,746 LF of Pipe Lining - 10" Sewer Main THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required-see above Addendums: two Cost: $25 (pick-up)/$30 (includes US Mail postage and handling fees) Available on or after: October 19, 2009 | Pre-qualified Contractors who have purchased the bid package | Bid Amount | | Miller Pipeline Inc | Not Applicable | | Insituform Technologies Inc | Not Applicable | | Reynolds Inliner Inc | Not Applicable | | Heitkamp Inc | Not Applicable | | Am Liner East Inc | Not Applicable |
Contract #09216 GX0Olympian Park ImprovementsTowson - District 9 c 5 Contract Cost Group "B" ($100,000 to $500,000) Work Classification: E Bid Date: Tuesday, December 8, 2009 at 10:30 a.m. local time The proposed work consists of: Construction of brick walkways, benches, sidewalks, curb and landscaping. A pre-bid meeting will be held on Wednesday, November 25, 2009 at 10 a.m. local time in room 215, County Office Building, 111 West Chesapeake Avenue, Towson, MD 21204 THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $20 (pick-up)/$25 (includes US Mail postage and handling fees) Available on or after: November 9, 2009 Bidder's List| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | No Bidders Yet | Not Applicable |
Contract #09223 GX0Pedestrian Bridge Replacement of Robert E. Lee Park over the Jones Falls, 1000 Lakeside Drive, Baltimore, MD 21209Mount Washington - District 9 c 2 Contract Cost Group "D" ($1,000,000 to $2,500,000) Work Classification: D-1 Bid Date: Tuesday, January 5, 2010 at 10:30 am local time *Note: Contract Documents will consists of One (1) Paper Copy Proposal Book and One (1) Compact Disk (CD) with all of the required drawings. The CD will be in PDF format. Contractors and Subcontractors can purchase paper copies of the drawings from Baltimore County, OIT, Central Printing located in the basement of the County Office Building, room G-9 for $1.50 a copy. The proposed work consists of: (LS) Substructure Concrete for Bridge (LS) Pre-stressed Concrete Beam (LS) Superstructure Concrete for Bridge (LS) Retaining Walls A pre-bid meeting will be held on Thursday, December 10, 2009 at 10 a.m. local time, room 215, County Office Building, 111 West Chesapeake Avenue, Towson, MD 21204. THE PROJECT IS SUBJECT TO A MINORITY BUSINESS ENTERPRISE UTILIZATION GOAL AND FEMALE CONTRACTORS UTILIZATION GOALS FOR BIDS IN EXCESS OF $50,000. THESE GOAL REQUIREMENTS ARE MORE FULLY EXPLAINED IN THE SPECIFICATIONS. THE MBE/WBE FORMS IN THE PROPOSAL BOOKLET MUST BE COMPLETED AND SUBMITTED AT THE TIME OF BID OPENING. MBE required (see above) Addendums: 0 Cost: $20 (pick-up)/$25 (includes US Mail postage and handling fees) Available on or after: November 16, 2009 Bidder's List| Pre-qualified Contractors who have purchased the bid package | Bid Amount | | No Bidders Yet | Not Applicable |
Revised November 6, 2009 |